addressalign-toparrow-leftarrow-rightbackbellblockcalendarcameraccwchatcheckchevron-downchevron-leftchevron-rightchevron-small-downchevron-small-leftchevron-small-rightchevron-small-upchevron-upcircle-with-checkcircle-with-crosscircle-with-pluscrossdots-three-verticaleditemptyheartexporteye-with-lineeyefacebookfolderfullheartglobegmailgoogleimageimagesinstagramlinklocation-pinmagnifying-glassmailminusmoremuplabelShape 3 + Rectangle 1outlookpersonplusprice-ribbonImported LayersImported LayersImported Layersshieldstartickettrashtriangle-downtriangle-uptwitteruseryahoo

New Meetup: Skyline Ridge Open Space Preserve

From: Ray G
Sent on: Sunday, April 4, 2010 4:53 PM
Announcing a new Meetup for South Bay Mountain Bike Group!

What: Skyline Ridge Open Space Preserve

When: Saturday, April 17,[masked]:00 PM

Where:
Skyline Ridge OSP
22200 Skyline Blvd
Palo Alto, CA 94301

We will meet at 1:00 PM in the parking lot at Skyline Ridge OSP. When you enter the parking lot, turn left and park in the first area. We will start from there.

Tires roll at 1:15 PM or when all YES RSVP's are present.

Please be on time or early. I plan to ride south to Saratoga Gap through Long Ridge Open Space Preserve which will take us on Peters Creek and Long Ridge Trails. This is a great area to ride!!!

Ride limit is at 10, if you RSVP Maybe, please update your status no later than 24 hours before or I will cancel it so others may join us. Thank you.

Directions:
Page Mill Road to Skyline Blvd. Then turn left (south) at the stop sign. You will drive about a mile and the parking lot will be on the right.
The drive up Page Mill will take about 25 min from the 280/Page Mill area.

This should be a fun place to ride. If Peters Creek Trail is closed due to trail conditions, this ride date will be moved. You have read the past ride reviews and seen the pictures, this is a fun group!!! As always, we will never leave anyone behind, take needed breaks, and regroup often. Plan to ride for 2 to 2 1/2 hours.

If your not sure where you are going or think you will be late, please leave earlier. We want you to join us for this ride.

Ride Details
Difficulty as noted in my Mtn Biking guide book is: "Moderate with a few modest climbs". On my scale of 1 -5, 1 being easy - I will say this may be a 2-3.

Rain 48 hours before the ride may cancel. Check here for updates Saturday morning.

***Please remember, a helmet is required for all our rides.***

Learn more here:
http://www.meetup.com/South-Bay-Mountain-Bike/calendar/13085791/

Our Sponsors

People in this
Meetup are also in:

Sign up

Meetup members, Log in

By clicking "Sign up" or "Sign up using Facebook", you confirm that you accept our Terms of Service & Privacy Policy