| Meetup at 9 December: please RSVP yes or no - Hi nlscrum members, Our next meetup is at 9 December at SDL Tridion. We will have presentations by certified Product Owner trainer Arlen Bankston and by Onno Ceelen, who will speak about testing in Scrum projects. After that, SDL Tridion is kin | Marco Mulder | Nov 23, 2009 |
| RE: [scrum-9] Scrummaster: line manager or projectmanager? - | Niels Verdonk | Nov 20, 2009 |
| Re: [scrum-9] Scrummaster: line manager or projectmanager? - @Niels, Great info. I guess this is all the result of the fact that Scrum is not describing every little step we should take, but provides more guidelines and principles, which give a lot of space for self interpreration and applying those pri | Ivanildo Falkenstein | Nov 20, 2009 |
| Re: [scrum-9] Scrummaster: line manager or projectmanager? - Note that Scrum is a development proces *framework*. Scrum has 3 predefined roles (product owner, scrum master and team) but you are free to add roles. So if a Product Lead works for you, introduce the role. We added a few roles in our pr | erik buitenhuis | Nov 20, 2009 |
| RE: [scrum-9] Scrummaster: line manager or projectmanager? - Hi All, I saw some statements passing by, I'll show a few below, the context isn't relevant. * for that reason we introduced the Product Lead role in our organization. * I think it is important to have a technical coordinator on the team. * I wo | Niels Verdonk | Nov 20, 2009 |
| Re: [scrum-9] Scrummaster: line manager or projectmanager? - Preview not available | Ivanildo Falkenstein | Nov 20, 2009 |
| Re: [scrum-9] Scrummaster: line manager or projectmanager? - Preview not available | Gertjan Assies | Nov 20, 2009 |
| RE: [scrum-9] Scrummaster: line manager or projectmanager? - | Harald Rietman | Nov 20, 2009 |
| RE: [scrum-9] Scrummaster: line manager or projectmanager? - | Martin van Dijken | Nov 20, 2009 |
| RE: [scrum-9] Scrummaster: line manager or projectmanager? - | Niels Verdonk | Nov 20, 2009 |
| Re: [scrum-9] Scrummaster: line manager or projectmanager? - Preview not available | Aleksander Brancewicz | Nov 20, 2009 |
| Re: [scrum-9] Scrummaster: line manager or projectmanager? - Preview not available | Lars Vonk | Nov 20, 2009 |
| Scrummaster: line manager or projectmanager? - | Martin van Dijken | Nov 20, 2009 |
| RE: [scrum-9] Moeten we de lengte van onze sprint groter maken? - Het hangt inderdaad duidelijk af van een veelvoud aan factoren. Zoals Eelco aangeeft is een lange integratie periode een overweging, echter denk ik dat integreren zoveel mogelijk continue gebeurd. De reden die ik gevonden heb voor korte (2 weken) spri | Jeroen van Berkel | Nov 17, 2009 |
| Re: [scrum-9] Moeten we de lengte van onze sprint groter maken? - Er zijn een aantal redenen om met sprintlengtes te 'spelen'. De meest voorkomende lengtes zijn twee of vier weken. Redenen om korte sprints te nemen (1 of 2 weken): - In adoptie van Scrum doe je sneller | Eelco Rustenburg | Nov 17, 2009 |
| Moeten we de lengte van onze sprint groter maken? - Een veel voorkomend advies is om sprint en iteratie lengtes korter te maken in plaats van langer. Is dat wel een goed idee? | Maurice le Rutte | Nov 16, 2009 |
| Fwd: XP2010 - Interested to present at Agile conference in Europe? - ---------- Forwarded message ---------- From: Rachel Date: Tue, Nov 3, 2009 at 11:45 PM Subject: [agilealliance] XP2010 - Interested to present at Agile conference in Europe? To: [address removed] The 11 | Marc Evers | Nov 4, 2009 |
| Fwd: ANN: 8 places left for XP Days Benelux - ---------- Forwarded message ---------- From: Pascal Van Cauwenberghe Date: Tue, Oct 27, 2009 at 4:14 PM Subject: [xp-nl] ANN: 8 places left for XP Days Benelux To: [address removed], [address removed] If you want to t | Marc Evers | Oct 27, 2009 |
| Invitation to the XP Days Benelux 2009 conference - Hi, I'd like to invite you to XP Days Benelux in Mechelen, Belgium, on 23 and 24 November 2009. XP Days Benelux is the leading agile conference in the Benelux. The program has more than 35 sessions on all aspects of software development: experien | Marc Evers | Oct 6, 2009 |
| Next nlscrum meetup on December 9th @ SDL Tridion - Hi nlscrum members, The next nlscrum meetup has been rescheduled from December 17th to December 9th. We received feedback from several members that December 17th is not convenient because it is too close to Christmas. Onno Ceelen fro | Marco Mulder | Sep 25, 2009 |
| New Meetup: Next meetup, location to be announced - Hi nlscrum members! For those who where at the meetup Wednesday night, thanks for attending, it was you all who made this a great evening. Announcing a new Meetup for nlscrum - Scrum User Group Netherlands! Location to be announced. | Marco Mulder | Sep 2, 2009 |
| Meetup @ Marktplaats vol! - Beste nlscrum leden, Er is veel animo voor de Meetup @ Marktplaats op 2 september. De locatie heeft echter een beperkte capaciteit. Er is daarom een limiet ingesteld. Graag wil ik iedereen de "Maybe" heeft RSVPed vragen om | Marco Mulder | Aug 26, 2009 |
| Reminder: Agile Open Holland, 10-11 September, Baarn - (apologies if you receive this message more than once) Hi, I'd like to remind you of the Agile Open conference that Agile Holland is organizing on 10 & 11 September in Baarn. Agile Open is an Open Space conference on all aspects of agile software | Marc Evers | Aug 22, 2009 |
| 5th Nlscrum meetup at Marktplaats - Dear Nlscrum members, At September 2nd, we will have our 5th nlscrum meetup. This time, the meetup will be hosted by Marktplaats in Amsterdam. It promises to be another interesting meetup, where Scrum users of all experience levels to learn ab | Petra Kiers | Aug 18, 2009 |
| please RSVP + location details - Just forgot some details about the nlscrum meetup on September 2nd: If you want to come, please RSVP at the nlscrum website . The address if Marktplaats is: Wibautstr | Marco Mulder | Aug 6, 2009 |
| sept 2: nlscrum meetup @ Marktplaats - Hi nlscrum members, Four weeks from now, at September 2nd, we will have our fifth nlscrum meetup. This time, the meetup will be hosted by Marktplaats (!), courtesy of Cees de Groot. It promises to be another interesting meetup, where Scrum user | Marco Mulder | Aug 6, 2009 |
| ANN: Invitation to the Agile Open conference, 10-11 September, Baarn - Preview not available | Marc Evers | Jul 12, 2009 |
| Certified Scrum Master en Certified Scrum Product Owner! - Beste nlscrummers, *Zomeraanbieding* Van € 1.795,00 voor € 1.595,00 ! 14 en 15 september Certified ScrumMaster: Jeff Sutherland, Serge Beaumont en Marco Mulder 24 en 25 september Certified Scrum Product | Petra Kiers | Jul 7, 2009 |
|
more pictures of the nlscrum meeting - Hi all, I also took some nice pictures of the meeting with Jeff. Take a look at them on: http://www.flickr.com/photos/d |
Lucia Tovar Ruiz | Jul 1, 2009 |
|
[scrum-9] Pictures available of Jeff Sutherland meetup - Hi All,
I took some pictures at the last NLSCRUM meetup. If you are interested
have a look at http://www.flickr.com/photos/i |
Cirilo Wortel | Jul 1, 2009 |
| FYI: XP Day London 09: Call for Sessions - Preview not available | Marc Evers | Jun 29, 2009 |
| Differences between Scrum and Kanban - During the last meeting at Xebia, with Jeff Sutherland, I got the distinct impression that a lot of us are still struggling with the differences between Scrum and Kanban. Whereas I agree with Ron Jeffries [1] that there is not very much value in arguing a | Stefan van den Oord | Jun 29, 2009 |
| Re: [scrum-9] Named Clouds - Preview not available | Martin Schapendonk | Jun 25, 2009 |
|
Re: [scrum-9] Named Clouds - Hi all,
here is the link I assumed Martin left out to Ron Jeffries' Post:
http://xprogramming.com/blog/n |
Willem van den Ende | Jun 25, 2009 |
| Re: [scrum-9] Named Clouds - Hi Martin, A link would be nice ;-) | garbrand | Jun 25, 2009 |
| Named Clouds - Preview not available | Martin Schapendonk | Jun 25, 2009 |
| Re: [scrum-9] question: sprint length ?? - Preview not available | Emiliano Heyns | Jun 18, 2009 |
| Re: [scrum-9] question: sprint length ?? - Preview not available | Serge Beaumont | Jun 17, 2009 |
| Re: [scrum-9] question: sprint length ?? - Preview not available | Maurice le Rutte | Jun 17, 2009 |
| Re: [scrum-9] question: sprint length ?? - Preview not available | Marc Evers | Jun 17, 2009 |
| Re: [scrum-9] question: sprint length ?? - Preview not available | haiko | Jun 17, 2009 |
| Re: [scrum-9] question: sprint length ?? - Preview not available | Aliaksei Yanchuk | Jun 17, 2009 |
| Re: [scrum-9] question: sprint length ?? - Preview not available | Marco Heerebout | Jun 17, 2009 |
| RE: [scrum-9] question: sprint length ?? - Iterations of varying lengths are bad. They break the rhythm. A few years ago I introduced fixed iterations in a project. Initially they were two weeks long, because the team felt that the overhead of shorter iterations would be too high. After a few m | Eric Jan Malotaux | Jun 17, 2009 |
| RE: [scrum-9] question: sprint length ?? - | Martin van Borselaer | Jun 17, 2009 |
| RE: [scrum-9] question: sprint length ?? - Hello Wilfried, Indeed I agree with Ruud that the PO is a chicken in this regard. The question is also, does the PO even want this? One of the strengths of keeping the sprints the same size is that you can determine the speed of the team more accurate | Jeroen van Berkel | Jun 17, 2009 |
| Re: [scrum-9] question: sprint length ?? - Preview not available | Cirilo Wortel | Jun 17, 2009 |
| Re: [scrum-9] question: sprint length ?? - Preview not available | Ruud Rietveld | Jun 17, 2009 |
| question: sprint length ?? - Preview not available | Wilfried Mulder | Jun 17, 2009 |
| Details Jeff Sutherland @ June 24th nlscrum meetup - Hi, Is er al iets meer bekend over de details van deze bijeenkomst, zoals de locatie? Ik probeer eea in te plannen voor volgende week. Groetjes, Nicole Belilos | Nicole Belilos | Jun 16, 2009 |
| Jeff Sutherland's Training Course - Beste nlscrummers, Zoals je weet zal Jeff Sutherland op 24 juni bij de nlscrum user group meetup zijn. Inmiddels is deze avond vol en er is zelfs al een wachtlijst! Aansluitend aan deze avond zullen Jeff Sutherland en nlscrum-organ | Marco Mulder | Jun 3, 2009 |
| RE: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Jeff Sutherland covered "The Scrum Sensei". Google for it. Basically it comes down to, how can they self organize when they don't know how the game is played. Niels Verdonk----- Oorspronkelijk bericht ----- Van: Emiliano Heyns | Niels Verdonk | May 21, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - On Thu, May 21, 2009 at 11:25, Maurice le Rutte < [address removed] > wrote: | Emiliano Heyns | May 21, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Emiliano Heyns schreef: > > Welcome to an eternal dilemma. I (naively) tried to enforce all of > scrum all at once, just as management had dictated, and it was a disaster. > > What I settled on was providing the team with a Scrum for Team members | Maurice le Rutte | May 21, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - On Wed, May 20, 2009 at 13:19, Martin Schapendonk < [address removed] > wrote: | Emiliano Heyns | May 20, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Preview not available | Martin Schapendonk | May 20, 2009 |
| RE: [scrum-9] Next Meetup met Jeff Sutherland - | Mary | May 18, 2009 |
| Next Meetup met Jeff Sutherland - Dear nlscrum members, There have been some questions on the mailing list on the next meetup with Jeff Sutherland. We'll explain how we would like to organize this meetup: During the preparations for this meetup, we envisioned a grou | Marco Mulder | May 18, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Hmmm... No spots left? Why is there a maximum? Lars. On Wed, May 13, 2009 at 5:11 PM, Marco Mulder < [address removed] > wrote: | Lars Vonk | May 17, 2009 |
| RE: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Hi you all, This is a great discussion and a lot of interesting questions / topics! "TRUE PURPOSE OF FIXED LENGTH ITERATIONS / SPRINTS" Good points: Focus / having a deadline, reevaluation an delivering on a regular basis, convenient/ easy to remem | Mary | May 16, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - For me a sprint keeps the chaos outside for a short while, which helps the team to focus. If you are sailing you determine your course for the next tag. Depending on the waves, the wind and the weather the crew makes the tag as optimal as possible. | Maurice le Rutte | May 16, 2009 |
| RE: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Hi Stefan, Fixed length iterations are an important aspect for the team as well. It allows teams to build confidence in their ability to deliver 'x' velocity, and to see the velocity increasing over time while they inspect and adapt, improving as th | Niels Verdonk | May 16, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Hi Lars, Of course you are right about the organisational aspects. Indeed, it normally is most convenient to everybody to have a regular meeting, same time, same place, every week (for example). However, to me just having a regular meeting, doesn't | Stefan van den Oord | May 15, 2009 |
| Garter / Xebia - Masterclass Mature Agile - 9 juni - | Guido Schoonheim | May 15, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Hi Stefan, I think it would be interesting to discuss the true purpose of fixed-length iterations/sprints | Lars Vonk | May 15, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - I think it would be interesting to discuss the true purpose of fixed-length iterations/sprints. And I mean that not in the Scrum-intro textbook sense, but to those who have used Scrum for a couple of years and are experienced with it. Why create artificia | Stefan van den Oord | May 15, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Ik zou graag een set van adaptor patterns willen hebben voor grote projecten waarin de meeste teams *geen* scrum gebruiken en het ook niet gaan doen. Vaak kom ik voor grote projecten de suggestie van 'Scrum of Scrums' tegen, maar dat vereist een org | Maurice le Rutte | May 14, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - I would expect on a larger team the drop-back in velocity would relatively be equally high when frequently changing teammembers, it woul | Cirilo Wortel | May 14, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Preview not available | Emiliano Heyns | May 14, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - I prefer small teams varying from 3-5. In my experience teams with more than 5 are less effective and it is better to split them. I am curious: Why is it harder in small groups to change capacity and resources? Lars | Lars Vonk | May 14, 2009 |
| RE: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - | Niels Verdonk | May 14, 2009 |
| Integrating Agile Conference - Hi all, On the 18-th of June the Integrating Agile Conference will take place at Hoofddorp. Henrik Kniberg and Rob Thomsett are the keynote speakers, and there are 12 presentatio | Lars Vonk | May 14, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Hi Lars, It is a team, but I tend to call it a 'group' because is can be a team of 3 to 5 members with different disciplines, which implies that the members are not interchangable. Hans On Thu, May 1 | Hans Oerlemans | May 14, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Goodmorning all, we work in a 4 person team. And actually we introduced (a scaled down version) of SCRUM for just the reasons that Hans mentions: transparancy and communication. And it does very well. We have a board on the wall where, what would n | Rein Groot | May 14, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - Hi Hans, what exactly do you mean by a small group? Do you mean team? Lars On Thu, May 14, 2009 at 8:25 AM, Hans Oerlemans < [address removed] > | Lars Vonk | May 14, 2009 |
| Re: [scrum-9] Jeff Sutherland @ June 24th nlscrum meetup - nlscrum members, I would like to discus what aspects of Scrum can be used in smal groups and if this requires is an other approach. In small groups it is harder to change capacity and resources. It is mainly the transparancy and communications that | Hans Oerlemans | May 14, 2009 |
| Jeff Sutherland @ June 24th nlscrum meetup - Hi nlscrum members, Six weeks from now, at June 24th, the inventor of Scrum Jeff Sutherland will attend our user group meetup! | user 7778646 | May 13, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Preview not available | Edward Crain | May 7, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Preview not available | Dylan van Iersel | May 7, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Preview not available | Marco Heerebout | May 7, 2009 |
| Re: [scrum-9] Taalgebruik in Scrum groep - English will be easier...Thank you! On Wed, May 6, 2009 at 10:30 PM, Lars Vonk < [address removed] > wrote: | Roxana Frunza | May 7, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - @Dylan: '1 iemand het bord "bedient" en er dus veel vervelende pauzes' je zou kunnen overwegen tijdens planningsessies met stickies etc te werken en de administratie later te doen. nb. 1 keer overtikken weegt waarschijnlijk op te | marc | May 6, 2009 |
| Re: [scrum-9] Taalgebruik in Scrum groep - Since I am interested in the opinions of non Dutch speaking participants I vote for English. On Wed, May 6, 2009 at 5:27 PM, Martin van Dijken <[address removed]> wrote: | Lars Vonk | May 6, 2009 |
| Re: [scrum-9] Taalgebruik in Scrum groep - I'm a brand new member and as most of my colleagues I'm not really confident with Dutch (I'm working on it but I'm not there yet) So I would prefer English if you ask :) (At the moment I'm following with google translator :p) Giorgio On Wed | Giorgio | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Hi Martin, I am fine with english and think it's a good point you're making :) About your previous question, I think that wether the digiboard is actually used for updating tasks is up to the individual team members. I definitely used it and | Cirilo Wortel | May 6, 2009 |
| Taalgebruik in Scrum groep - Hoi, De emails in de groep zijn in het Nederlands, wat zinnig is aangezien het nlscrum heet. Onze Scrummaster (in NL) is echter Pools en ik zie wel meerwaarde in zijn deelname aan de groep. Wat vinden jullie, Nederlands of Engels op de maillijst? | Martin van Dijken | May 6, 2009 |
| RE: [scrum-9] digitale tools versus fysiek Task Board - Hoi Cirilo, Zo'n fysiek digitaal board leek mij altijd ideaal, ons team is ook verspreid over 2 locaties. Als je jullie oplossing afzet tegen het bijhouden van twee systemen, hoe bevalt het dan? Het scheelt natuurlijk wat tijd wat mooi is, maar hoe erv | Martin van Dijken | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Hi Robert, Misschien had je mijn reply al gelezen, maar dit is precies wat wij geprobeerd hebben en wat goed werkt, wij hebben | Cirilo Wortel | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - (zonder andere replies gelezen te hebben) Ik ben het in principe eens met de stelling. Je kunt natuurlijk een electronisch taskboard op de muur beamen, maar dan mis je nog steeds het aanpas-aspect. Of een grote monitor en een verder ongebruikt | Ruud Rietveld | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Preview not available | Dylan van Iersel | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - 2009/5/6 Cirilo Wortel < [address removed] > | Emiliano Heyns | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Mijn ervaringen komen overe | Robert de Wolff | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Naar mijn idee is in het geval van een gedistribueerd team een digitale whiteboard de ultieme oplossing. Doordat het bord fysiek en duid | Cirilo Wortel | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Hi all, Hierop voortbordurend, heeft iemand ervaring of kent een merk/type digiboard waarmee je wel fysiek de taken kan verplaatsen n | Jorg Hollenberg | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Hi, Ik denk dat een fysiek bord zeker zijn voordelen heeft zoals velen mensen al hebben genoemd. Wij gebruiken zelf ook een fysiek bord. Ik heb in het begin van dit jaar ook even naar een digitale versie gekeken zijnde VersionOne. Op zichzelf een m | Hugo Hendriks | May 6, 2009 |
| RE: [scrum-9] digitale tools versus fysiek Task Board - | Berend Tel | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Onzin. (Full disclosure: ik werk bij agile42 en naast Scrum consulting leveren wij software ter ondersteuning van het Scrum pro | garbrand | May 6, 2009 |
| RE: [scrum-9] digitale tools versus fysiek Task Board - | Niels Verdonk | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Hi Allemaal, ik kan me helemaal vinden in de punten van Jorg. Aangezien wij werken met een lokaal team (in tijd en ruimte) is fysiek echt de beste optie. Het met elkaar om de taken heen staan er fysiek mee kunnen interacteren stimuleerd de team com | Rein Groot | May 6, 2009 |
| Re: [scrum-9] digitale tools versus fysiek Task Board - Hoi Marco en andere leden, Qua zichtbaarheid in een lokaal team ben ik van mening dat een fysiek board het beste is. Helaas hebben wij ook teams in de US en in Oost Europa, en zelfs een g | Gertjan Assies | May 6, 2009 |