addressalign-toparrow-leftarrow-rightbackbellblockcalendarcameraccwchatcheckchevron-downchevron-leftchevron-rightchevron-small-downchevron-small-leftchevron-small-rightchevron-small-upchevron-upcircle-with-checkcircle-with-crosscircle-with-pluscrossdots-three-verticaleditemptyheartexporteye-with-lineeyefacebookfolderfullheartglobegmailgoogleimageimagesinstagramlinklocation-pinmagnifying-glassmailminusmoremuplabelShape 3 + Rectangle 1outlookpersonplusprice-ribbonImported LayersImported LayersImported Layersshieldstartickettrashtriangle-downtriangle-uptwitteruseryahoo

Harris Lake Work Day

We will be working on rebuilding the feature on the inner loop. Replacing the tree, fixing the ramp onto the structure, and creating another ramp off the other side. We can do other maintenance if enough folks show up and we have the time.

Join or login to comment.

  • Andy L.

    Great work day. Everything worked out really well. I can't wait to get out there and ride the new log.

    1 · June 1, 2013

  • Pete P.

    Great work everyone. Thanks for helping out!

    1 · June 1, 2013

  • Dave W

    Batteries for the drill charging now. See ya tomorrow.

    May 31, 2013

  • Andy L.

    The only thing we may need is battery powered drills. They always seem to run out.

    May 30, 2013

  • Pete P.

    Andy, do you us to bring any special tools?

    May 30, 2013

6 went