addressalign-toparrow-leftarrow-rightbackbellblockcalendarcameraccwcheckchevron-downchevron-leftchevron-rightchevron-small-downchevron-small-leftchevron-small-rightchevron-small-upchevron-upcircle-with-checkcircle-with-crosscircle-with-pluscrossdots-three-verticaleditemptyheartexporteye-with-lineeyefacebookfolderfullheartglobegmailgooglegroupshelp-with-circleimageimagesinstagramlinklocation-pinm-swarmSearchmailmessagesminusmoremuplabelShape 3 + Rectangle 1ShapeoutlookpersonJoin Group on CardStartprice-ribbonShapeShapeShapeShapeImported LayersImported LayersImported Layersshieldstartickettrashtriangle-downtriangle-uptwitteruserwarningyahoo

Fwd: Falls Lake Workday - March 16, 2013

From: Will & D.
Sent on: Monday, March 11, 2013 10:51 PM
Just in case y'all have not seen this latest message from Jeff Brewer:

Subj: Falls Lake Workday - March 16, 2013
 

Falls Lake MST Workday

March 16, 2013

RSVP TODAY!
  
Dear Will and Donna,

Workday - March 16, 2013 - 9:00 AM

 

Falls Lake Workday - Come help with trail work on the MST on March 16, 2013! We will meet at 9:00 AM and move to the project sites.

 

NEW Meeting Spot - All interested should meet at Food Lion parking lot at the intersection of Patterson/Sherron and Highway 98. Please use google maps for this intersection. After we meet we will split up into project groups and "scatter out" to do our trail work.

 

Major Projects:

-       24 foot bridge construction near Cheek Road

-       Bridge preparations for 2 new bridges near Ellerbee Creek

-       A small trail relocation near Highway 98 and Six Forks Road

-       Chainsaw work by S212 Volunteers

 

We will also be doing regular trail maintenance on the sections from the Falls Lake Dam to Penny's Bend. We will split up in groups and leave the meeting spot and shuttle cars to the various trail heads. Everybody will need a day pack and be prepare to hike with your tools to perform trail maintenance. Five to eight volunteers with a trail crew leader will scatter out to perform this work.

 

Please RSVP to [address removed] or [masked] by Wednesday!

 

Thanks to Great Outdoor Provision Company for sponsoring our breakfast from Chick-Fli-A at our workdays.  Thanks also to Starbucks off Falls of Neuse Road and Durant Road for the coffee. 

 

The Falls Lake Task Force leaders recently had a meeting to discuss our weather polity for workdays if bad weather is present.  If the workday is canceled  a mass email will be sent by 9:00 PM on Friday. So please check your email first thing Saturday morning before leaving.
 
If you are new at trail work please let us know and we will pair you up with an experienced person.
 
What you will need.
            Work clothes and solid shoes or hiking boots.
           
Proper Clothing for the Weather!
            Plenty of water
            Lunch
            Work gloves, if you have them (If not, we have some)
 
Work Safely. This is the most important thing, and our main goal.
In particular:

 

Use tools carefully. If you do not know how to use a particular tool, or what to do in a particular circumstance please ask. Do not work too close together and be careful with rakes, shovels, and mattocks to avoid hitting the person next to you. When walking past another volunteer, please say something so they know you are there. Do not lift anything heavier than you can comfortably lift.

 

Know you own limits. This is not a race. We will be working on and maintaining this trail for years to come. Take plenty of breaks. Make sure to drink plenty of water, even when it's cold outside.

 

There are holes in the ground to step in, branches to trip over, thorns, wasps, poison ivy (fortunately not too much of that on this segment of trail), ticks, chiggers, and other hazards. Please be cautious.
 
Have a good time. This is a scenic area. There are box turtles, heron, woodpeckers, deer, beaver, and other wildlife in this area as well as scenic views of the lake.
 
We have the tools that will be needed.
 
Particular tasks for this workday.

 

Cutting branches and logs across the trail:

 

We have clippers, small saws, and a chainsaw for this purpose.  All of the chainsaw work needs to be done by a certified person at the workday. In general, while standing on the trail you want to cut branches back to an arms length on both sides and above your head. When clipping a branch that extends over the trail, try to cut the branch at the trunk of the tree or bush. When there is a small tree or bush in the trail, do not cut it at the ground, but cut it ~3' above the ground to make it easier to dig out/pull out. Cut off at ground level they will tend to grow back from the roots. When cutting branches, please drag them off the trail. In particular if you end up clipping poison ivy, make sure to drag it well off the trail with the clippers.

 

Dragging logs off the trail.

 

There are a significant number of logs and branches lying across the trail route. These need to be dragged to the side. Many are so rotted they can most easily be removed with a shovel.

 

Trash

 

We have trash bags to pick up trash along the way. Fortunately this part of the park is relatively clean so we will not have too much trash to remove. The main trash that we want to try to remove on this workday is the barbed wire and other fence wire that in places crosses the trail. Please wear leather gloves and safety glasses and use caution in cutting wire. We will carry the trash out to one of the ends of this trail or it can be carried back to the trailer.

 

Raking the trail

 

It is necessary to rake the trail tread clear of leaves, branches, other debris so that we know where we need to level the trail, fill holes, etc. Please use caution while raking to avoid poking others with the rake handle.

 

Pulling out small saplings from the trail tread

 

There will be some small saplings in the trail tread. If these are cut off they tend to grow back from the roots, so we need to either pull them by hand (if they are very small), dig them out with a mattocks, or if they are up to an inch in diameter, pull them out with the weed wrench.

 

Filling holes

 

These need to be filled if they are within the 2' wide trail tread, or if they are within several feet of the trail on either side. We have shovels and buckets for this purpose.

 

Leveling the trail tread

 

Walking across the side of a hill is tiring. The finished trail tread should be, in cross section, close to level. We have mattocks and rakes for this purpose. On this section of trail we cross multiple drainage dips, and have quite a bit of side hill trail to build. In addition to the side hill work, much of the trail route has various lumps and bumps that need to be leveled.

 

Stream crossings

 

There are multiple small stream crossings along this route. We will not be working on these on this workday, but in the future we plan to build small bridges across several of these.

 

Sincerely,

 

Jeff Brewer

  

 

 

 

 

 

Friends of the Mountains-to-Sea Trail
P.O. Box 10431

Raleigh, North Carolina 27605
http://visitor.constantcontact.com/do?p=un&mse=001JhAH0M7VcWejT9hvrYwgpEWKu_3k-7ts&t=001M7cW43uMZj9gjHKO_kKhWw==&llr=54ke8qcab http://www.constantcontact.com/index.jsp?cc=assoc05
This email was sent to [address removed] by [address removed] |  
Instant removal with SafeUnsubscribe| Privacy Policy.
Friends of the Mountains-to-Sea Trail | P.O. Box 10431 | Raleigh | NC | 27605

Our Sponsors

Sign up

Meetup members, Log in

By clicking "Sign up" or "Sign up using Facebook", you confirm that you accept our Terms of Service & Privacy Policy