Blue Sage Ranch & Heber Valley Brewery (Intermediate)
Details
We got a couple of extra days before the rain and snow are supposed to start, so let's take advantage of it.
The Ride: Up the beginner trails then lap the intermediate until we get tired. These trails were built by Shapeshift Terrain Parks. There's two downhill trails up top. I'm planning on riding the bigger one twice and the smaller one once. Then head back down the way we came up.
Stats from last time with two laps on each of the DH trails: Distance 16.41 km Climbing 445 m
Beginners that want to lap the green trails and join us afterward are welcome.
After Ride Social: Heber Valley Brewing, north end of Main St. by the bowling alley.
Weather: Check for changes the day of. This may get moved depending on how the trails are.
Disclaimer: All events are at your own risk. (Full disclaimer (https://mountainadventures.us/slcmtb/disclaimer)
