Skip to content

FREE ON SITE MEETING/PARTY - HOW TO DO A REMOVAL HOUSE / END OF SUBDIVISION

Photo of David Manteit
Hosted By
David M.
FREE ON SITE MEETING/PARTY - HOW TO DO A REMOVAL HOUSE / END OF SUBDIVISION

Details

ON SITE MEETING/PARTY

2pm-3pm - Barbecue including free beer wine and soft drink

3pm - 4pm David Manteit to describe the details of how the removal
house is done and the 3 lot subdivision

4pm plus - Another shandy or two for those who want to stay and mingle

See an actual removal house halfway finished before the plasterboard goes on.

We shall explain -

The costs
The move from Brighton to Brighton
The approvals required, engineering and certification
The steel engineering - how to design and construct.
Bracing of house,concrete, sewerage, stormwater.
How to design the interaction between the upstairs and downstairs
How to design outdoor living space.
The latest external sheeting that is quick and easy.
What type of floorings are available.
Can you make any money ?

Subdivision

We shall describe how the 3 lot subdivision was done. Sewerage, water and stormwater. You can see for yourself. 3 houses including the removal house are almost finished.

Transport

You can catch the 310 Bus from Queen St to the door of the house.
Perhaps you can share a car.

This is a rare opportunity to see the in depth details step by step of how a Queenslander is transported and design to fit the block in the Small Lot Code (and bushfire zone) area.

Please feel welcome and I hope to see you there.

Please RSVP so we need to cater and supply chairs.

Photo of Subdivision Millions group
Subdivision Millions
See more events
161 Baskerville St
161 Baskerville St · Brighton, QL