Skip to content
Bollinger Canyon

Details

30 miles
1100 ft elevation gain
Bollinger Canyon from Rudgear | 29.6 mi Cycling Route on Strava

Friendly social ride starting in Walnut Creek, heading south on bicycling friendly Danville Blvd, for a coffee stop (Peet's in Danville) then continuing on to San Ramon Valley Rd to Crow Canyon, then Bollinger Canyon to the end. Bollinger Cny is a pretty and woodsy quiet road with a gradual uphill (not steep) grade going out then a fun "Whee!" coming back. This is an out-and-back ride so it is easy to turn around at any point if you've had enough.

Possible lunch after the ride if anyone is interested.
This ride is on city streets with traffic.
Bring food, water and supplies to repair a flat.
We'll have several regroups along the way if the group gets spread out.
Helmet Required.
Meet at the Rudgear Rd. Park and Ride lot. Note: this IS NOT the little parking lot next to the Iron Horse Trail.
Roll at 10 AM sharp.

Photo of Contra Costa Cyclists group
Contra Costa Cyclists
See more events
Rudgear Rd Park and Ride lot
Rudgear Rd and I-680 · Walnut Creek, CA