EBIKE STREET AND DIRT - WEST CHATSWORTH LOOP AND OPTIONAL PICNIC
Details
This loop ride will have us start at Victory Blvd. heading west to the Bell Canyon fire Road which takes us to the Albertson Road and eventually into Simi Valley. The first have of the ride will be on a dirt road. The second half will be on streets in the Chatsworth area leading south toward our cars. After the ride, as an option, we can have a picnic lunch at a park two blocks away.
MEETUP LOCATION AND TIME: Victory Blvd at 9:00am
RESTROOMS: Yes
ROUTE This will be our planned route.
DISTANCE: 25 miles
ELEVATION GAIN: 3600'
DURATION: 4+ hours
BIKE TRAIL DESCRIPTION: Dirt and paved roads
THE PACE: 6 MPH on up.
LEVEL: Intermediate
DEBRIFING: Pack a picnic lunch you can enjoy after the ride at Knapp Additional Park
MY CELL # IS 805-358-5972
Related topics
Bicycling
Bikers
Bicycle Riding
E-Bikes
Electric Bicycles (E-Bikes)
