Skip to content

Details

This Ebike ride will consist of 94% paved roads. 6% will be on dirt roads. Along the way, we'll ride that portion of Mulholland Drive, known as the Snake, that is closed to vehicle traffic.

Make sure you bring along a spare inner tube and slime.

MEETUP LOCATION AND TIME: Berniece Bennett Park at 9:00am.

RESTROOMS: At the meetup location and parks during the ride.

ROUTE This will be our planned route.

DISTANCE: 29 miles

ELEVATION GAIN: 2700'

DURATION: 4+ hours

BIKE RIDE DESCRIPTION: This will be a loop on paved roads and two miles of dirt roads.

THE PACE: 8 MPH on up.

LEVEL: Intermediate

LUNCH: At the end of the ride, as an option, you can join me for lunch at The Stonehause.

MY CELL # IS 805-358-5972

Related topics

Events in Westlake Village, CA
Bicycling
Bikers
Bicycle Riding
E-Bikes
Electric Bicycles (E-Bikes)

You may also like