Skip to content

Details

This Ebike ride will consist of 100% paved roads. Along the way, we'll ride that portion of Mulholland Drive, known as the Snake.

Make sure you have slime in your innertubes or tires so as to prevent a flat.

MEETUP LOCATION AND TIME: Berniece Bennett Park at 9:00am.

RESTROOMS: At the beginning, end and middle of ride

ROUTE This will be our planned route.

DISTANCE: 27 miles

ELEVATION GAIN: 2900'

DURATION: 4+ hours

BIKE RIDE DESCRIPTION: This will be a loop on paved roads.

THE PACE: 8 MPH on up.

LEVEL: Intermediate

LUNCH: At the end of the ride, as an option, you can join me for lunch at The Stonehause.

MY CELL # IS 805-358-5972

Related topics

Events in Westlake Village, CA
Bicycling
Bikers
Bicycle Riding
E-Bikes
Electric Bicycles (E-Bikes)

You may also like