Trip To The Enon Valley Boneyard Then On To The Riverwalk
Details
With the ultimate goal of replacing the bridge on the 'River Walk' along Little Beaver Creek in Darlington we're heading to our storage spot - The Boneyard - in Enon Valley on Monday, December 1st to gather some needed construction material. We'll then head to Darlington to haul this good stuff out to the bridge site to have it spotted for construction day (TBD).
The weather forecast calls for COLD that day so we'll wait until 12:00 noon to meet at the Enon Valley Post Office - 7150 Vine St. - and head to the Boneyard from there.
All help in cutting, gathering, and hauling is appreciated! My thought is to pick up the tracked transporter on our way through Darlington and use that to deliver all of the decking material in a trip or two. We'll see how that works out for us.