Skip to content

Details

### Trail Work Day Project Overview

The Issue:
Water is flowing down the connector between the two Pine Warbler trails (red arrow), causing erosion on the left side of Pine Warbler II.
The Fix:
We will reroute the trail around the sign (shown by the black line).
The Result:
This reroute will allow water to shed off the side of the trail and flow naturally toward the creek (blue arrows), helping prevent future erosion.
This will be a large project, and having a strong volunteer turnout would allow us to fix an area that has been a recurring problem. We’re proud to share that we logged over 400 volunteer hours at Williamson last year—thank you to everyone who contributed!

### What to Bring

  • Good work shoes or boots
  • Gloves
  • Water

Tools will be provided.
If we have trucks or SUVs available, we can drive down part of the way. Otherwise, it’s not a long walk, or you’re welcome to ride your bike.

### Waiver

Please complete the 2026 waiver linked below. Once submitted, you’ll be covered for all of 2026. https://www.torc-nc.org/waiver/

If you have any questions or need additional information, please don’t hesitate to ask.

Members are also interested in